This long-awaited pond and wetland restoration project was finally completed last week, after years of permitting and fluctuating site conditions. The scope of work involved constructing a concrete dam at the outflow of the pond, to maintain the pond’s water level, thereby upholding a functioning pond ecosystem.

The pond in fall, with the last remaining blooms from the wildflower & grass riparian buffer.

Landscape Site Conditions 

No doubt, this is a rare and special property, spanning a range of ecosystems.  

Full property view showing the range of ecotypes and habitats: upland field & forest, wet meadow, riparian buffer, pond and forested wetland.

In the rear of the property, a mature forested wetland borders a wet meadow and freshwater pond, surround by a riparian buffer; and closer to the home, upland habitat both forest and fields. 

Black-eyed Susan makes a fabulous permitter around the pond, while preventing nutrient-loading and providing pollinator habitat.

This landscape is diverse and mature, an exhilarating example of the potential for carbon sequestration, habitat creation, and stormwater and soil conservation on every property.

The organic wet meadow in late summer, featuring goldenrod and New York ironweed.

It represents both a naturalistic landscape design and strategic ecological management of existing ecosystems (forest, meadow) to optimize the ecological potential and productiveness. 

Another view of the organic wet meadow with the mowed walking path.

Pond Site Conditions & History

The one-acre pond in South Salem, NY is fed by Truesdale Lake via the Waccabuc River. The pond can experience extreme vacillations in water level, especially in the fall when the lake association performs a draw down, sending a surge of water downstream.  Previously, there had been a temporary wooden dam in the same spot that eventually succumbed to the water pressure. 

The forest wetland ecosystem borders the one-acre pond; the whole system is part of the NYC watershed.

In the summer months especially during a drought, the pond water level can drop significantly, bordering on a swamp / bog environment. Swamps, although valuable in terms of flood mitigation, run the risk of becoming mosquito-breeding grounds and are less desirable residential landscape features. 

Swamps are mosquito breeding habitats. Photo by National Geographic.

Mosquito habitats bear the added public health risk of spreading diseases such as West Nile. We can design and manage landscapes to naturally discourage mosquito habitat, without using toxic chemicals.  Learn more on our previous blog, Landscape Design for Natural Mosquito Control

Vegetative riparian border circles the entire perimeter of the pond, absorbing runoff and preventing erosion.

Healthy, freshwater pond ecosystems such as this one naturally reduce mosquito potential by providing food, habitat and healthy competition among precious species.

Permitting & Engineering

To make things more complicated, this wetland system is part of the watershed that feeds New York City, entering another tier of environmental protections and additional permits required. The entire project was permitted and monitored by the New York Department of Environmental Conservation.

Lovely seating area beneath mature trees around the perimeter of the pond.

We partnered with JMC, an engineering, planning and landscape architecture firm, who developed the engineering and construction plans for the dam, as well as detailed site protection instructions. JMC also conducted site inspections throughout the project. Special thanks to David Lombardi for being a great communicator and a pleasure to work with!

Designing Riparian Borders for Water Quality

The client wanted to preserve the pond environment, and to do so, we needed to maintain a consistent water level to support the aquatic plants and organisms. 

Panoramic view of the pond with the native wildflower riparian border.

The pond perimeter was seeded with the Riparian Buffer MixObligate Wetland Mix, and the Showy Northeast Wildflower & Grass Mix, all from Ernst Seed, to create a native vegetative border between the upper lawn and the pond area. This border effectively prevents nutrient-loading in the pond by intercepting stormwater runoff from the lawn. GJL also seeded winter rye for quick germination and soil stabilization while the other wildflowers and grasses filled in.

The wildflower riparian buffer in fall featuring native asters and goldenrod.

Native plants, especially wetland plants, naturally uptake and bio-filter water of pollutants. Of course, they also provide habitat for our native pollinators and birds; of extra importance for this property, given the surrounding forest and high bird activity.

Asters and goldenrod are both favorite late-season pollen sources for pollinators, and look fabulous paired together.

The designed vegetative border provides essential fringe and transition habitats for wildlife.  Adjacent to the pond is a managed wet meadow, which also attracts a plethora of pollinators and birds.  Learn more about this Organic Meadow Management on our previous blog post.

The carbon sequestration power of the wet meadow/riparian border and the mature forest is inspiring and a model of ecological land use. 

Panoramic view of the organic wet meadow in summer, with mowed walking paths.

Site Protection in a Wetland Environment

GJL followed strict site protection protocols, as defined in our DEC permit.  We installed a construction road to transport materials and constructed a temporary silt-fence to prevent sediment from washing into the pond (preserving water quality).

Construction road leading to dam site, and silt fence on the right (surrounding pond).

To divert the water from the future dam area, we installed a coffer dam made of sandbags and pond liner and staged a “de-watering area.”   

Jay working on the sand bag and pond liner coffer dam, site development for the concrete dam.

GJL also installed a culvert pipe to allow water to overflow into the rear forested wetland during times of high-water volume. 

Excavating around the new dam location.
Green Jay Crew carrying the culvert pipe to be installed to send excess pond water into the wetland.

Residential Concrete Dam Construction 

We faced a number of delays because of the ever-fluctuating water level, but at last we were able to divert the water and begin dam construction.  

Culvert pipe and overflow water (during construction process)

Jose and his team from J-R-One Contracting framed the dam, poured the concrete, and finished each side with a stone veneer.  The resulting dam is far more structurally sound and more beautiful than the previous wooden dam.

Framing the dam and pouring the concrete, thanks J-R-One!
Installing the stone veneer on either side of the dam for a polished look.

A wooden walking bridge constructed adjacent to the dam was extended 10′ longer than the original design plan, due to erosion of the banks over the years.

The finished wooden walking bridge next to the the dam.
view of the concrete dam construction, and the coffer dam in background holding back pond water.

Now, with the means to maintain a consistent water level, the aquatic ecosystem has a chance to restore itself. We can’t wait to see how this diverse pond ecosystem thrives! 

Dam area re-filled with soil.

Stream corridor restoration and channel modeling was also necessary after dam construction, to allow for proper flow elevations and hydrology. The hydrology has changed significantly since we began the permitting process six years ago; the past three years received extraordinarily high rainfall (bordering on a temperate rain forest) and a resulting high water table.

Completed damn during rain event.

GJL also seeded the former construction road with more native wildflower mix, which will again help to connect the wet meadow with the riparian border.

Culvert pipe & over flow area with finished grading around it.
The pond now has the foundation and structure to maintain it’s water level and ecology.

Contact us to discuss your wetland restoration or ecological landscape design project: 914-560-6570. 

A thriving aquatic and terrestrial habitat in South Salem, NY!
Contact Us To Schedule a Free

15 Minute Discovery Call

Let’s discuss your goals and determine if we are a good fit for your project.

15 Minute Discovery Call

This field is for validation purposes and should be left unchanged.
Resources and insights

Popular Articles from Our Blog

string(117) "https://www.greenjaylandscapedesign.com/wp-content/uploads/2022/11/Screen-Shot-2022-10-13-at-11.12.08-AM-1024x684.png"
2022-11-29 09:00:52
Green Jay Landscape Design
Introducing: Green Jay Landscape Design | NY, CT, NJ
Read
string(154) "https://www.greenjaylandscapedesign.com/wp-content/uploads/2022/08/1.This-landscape-design-invites-quiet-strolls-through-the-circular-paths.--1024x681.jpg"
2022-07-12 12:15:56
Green Jay Landscape Design
Our Best Backyard Landscape Designs in Westchester County, NY!
Read
string(96) "https://www.greenjaylandscapedesign.com/wp-content/uploads/2020/09/IMG_1578-p-2000-1024x682.webp"
2020-09-29 13:16:47
Green Jay Landscape Design
Landscape Design, Planning & Construction: When to Start the Process [VIDEO]
Read
string(99) "https://www.greenjaylandscapedesign.com/wp-content/uploads/2020/05/20220713-76-p-1080-681x1024.webp"
2020-05-06 13:18:10
Green Jay Landscape Design
Design for Biodiversity with Pollinator & Wildlife Gardens | Step 3 Toward a Healthy Landscape | Fairfield County
Read
string(115) "https://www.greenjaylandscapedesign.com/wp-content/uploads/2020/01/Jacobs.Final_.Planting.Plan_.8.22-1-1024x812.jpg"
2020-01-31 08:43:32
Green Jay Landscape Design
What Does a Landscape Design Master Plan Look Like?
Read